1vers.v4.29Launch Procedure0MRLMCCRdHillTime per step
2147:20MCCBEGIN SEQUENCE: Power on EGSEPower on EGSE1
3147:20WINDStart wind weighting analysis1
4147:20EGSECheck CLD connection1
5147:20EGSESwitch ON CLD via Battery & check voltage (24 Volt)1
6147:20EGSESwitch ON the primary and secondary supply switches on the Control Panel101:00
7146:20EGSE @MRLSwitch ON Sup_24V_20A & check voltage (ca. 27,2 Volt)1
8146:20EGSE @MRLSwitch ON Sup_24V_10A & check voltage (ca. 27,2 Volt)1
9146:20EGSE @MRLSwitch ON Sup_12V_10A & check voltage (ca. 13,8 Volt)1
10146:20EGSE @MRLSwitch ON Bat_24V_20A & check voltage (ca. 27,9 Volt)1
11146:20EGSE @MRLSwitch ON Bat_24V_10A & check voltage (ca. 27,9 Volt)1
12146:20EGSE @MRLSwitch ON Bat_12V_10A & check voltage (ca. 13,8 Volt)1
13146:20EGSE @MRLSwitch ON Sup_24V_40A1
14146:20EGSE @MRLSwitch ON Sup_5V_10A103:00
15143:20EGSEConnect to cRio1
16130:40EGSEConfirm storage capacity of cRio is greater than 300MB100:10
17143:20EGSEStart RT_VI1
18143:20EGSEOpen PID-VI and confirm it is running1
19143:20EGSERename PID-Logfile102:00
20141:20MCCBEGIN SEQUENCE: Connect Data UmbilicalConnect Data Umbilical100:30
21141:20MRLConfirm working personel is grounded1
22141:20EGSE @MRLConfirm ALL 8 bridges on the right side are inserted1
23141:20EGSE @MRLConfirm ALL 8 bridges on the left side are removed1
24141:20EGSE @MRLConnect Data Umbilical1
250:00EGSE @MRLRemove EXT_24V GROUND Bridge (1R)1
260:00EGSE @MRLRemove MAIN_BUS GROUND Bridge (2R)1
270:00EGSE @MRLRemove OBC2_BAT GROUND Bridge (4R)1
280:00EGSE @MRLRemove PAYLOAD1 GROUND Bridge (5R)1
290:00EGSE @MRLRemove RECOVERY_BAT GROUND Bridge (7R)1
30140:50EGSETurn ON EGSE EPS_BAT1
31140:50EGSETurn ON EGSE EXT_24V1
320:00EGSE @MRLInsert EXT_24V Bridge (1L)1
330:00EGSE @MRLConfirm EXT_24V LED is ON1
340:00EGSE @MRLInsert MAIN_BUS Bridge (2L)1
350:00EGSE @MRLConfirm MAIN_BUS LED is OFF (if ON pull MAIN_BUS Bridge (2L) & Insert all grounding Bridges on the right side1
360:00EGSE @MRLRemove EPS RADIO SILENCE Bridge (3R)1
370:00EGSETurn OFF EGSE EPS_BAT1
380:00EGSE @MRLConfirm MAIN_BUS LED is ON1
390:00EGSE @MRLConfirm 1 beep at Telemega1
40140:50OBDHClear SD-Card-using FileZilla FTP101:00
41139:50OBDHConnect to sbRio using remote Access utility1
42139:50MRLConfirm 3 beeps at OBC11
43139:50OBDHOpen RT_Sub_HMI1
44139:50OBDHConfirm Main Chute button is disabled1
45135:40OBDHCheck EPS hardware Voltages100:10
460:00EGSECheck EGSE Currents100:10
47139:50WINDReport on weather situation1
48139:50MCCBEGIN SEQUENCE: Connect Fueling armConnect Fueling Arm1
49139:50MRLConfirm working personel is grounded101:00
50139:50MRLConfirm PPG 0 bar1
51138:50MRLRemove Pneumatic Line from Fueling arm1
52138:50MRLMove Fueling arm to rocket1
53138:50MRLCouple Helium coupling1
54138:50MRLCouple N2O coupling1
55138:50MRLReattach Pneumatic Line to Fueling arm103:00
56135:50EGSEBEGIN SEQUENCE: EGSE sensor and actuator testEGSE sensor & actuator test1
57135:50MCCConfirm that video recording is enabled @ MCC100:10
58135:50MRLConfirm that Ignition Umbilical is disconnected1
59135:30EGSEStart PID data recording100:10
60135:20MRLClose HPNV1100:10
61135:20MRLClose HPNV2100:10
62135:10EGSE/ MRLSwitch OxDV to closed & check if magnetic valve LED is on100:10
63135:00EGSE/ MRLSwitch HPDV to closed & check if magnetic valve LED is on100:10
64134:50EGSE/ MRLCheck warning lamp on HPSM100:10
65134:40MRLRemove loose equipment103:00
66131:40EGSEActivate Heizi100:10
67131:30EGSEActivate N2O_Heater 1100:10
68131:20EGSEActivate N2O_Heater 2100:10
69131:10EGSEActivate He_Heater100:10
70131:00OBDHVerify Heizi @ RDVT & RDVET100:10
71130:50EGSE/ MRLCheck Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD100:10
72130:40EGSE/ MRLCheck Water Temperatures @ OxWT1, OxWT2, HPWT2100:10
73130:30EGSEDeactivate Heizi100:10
74130:20EGSE/ MRLCheck OxV1 (CLD & RT_VI)100:10
75130:10EGSE/ MRLCheck OxV2 (CLD & RT_VI)100:10
76130:00EGSE/ MRLCheck MPV3 (CLD & RT_VI)100:10
77129:50EGSE/ MRLCheck HPV1 (CLD & RT_VI)100:10
78129:40EGSE/ MRLCheck HPV2 (CLD & RT_VI)100:10
79129:30EGSE/ MRLCheck MPV1/2 (CLD & RT_VI)100:10
80129:20EGSE/ MRLCheck RDV (CLD & RT_VI)100:10
81129:10EGSE/ MRLCheck RMOxOV (CLD & RT_VI)100:10
82129:00EGSE/ MRLCheck RMOxSV (CLD & RT_VI)100:10
83128:50OBDHActivate Heizi100:10
84128:40OBDHVerify Heizi @ RDVT & RDVET101:00
85127:40OBDH/ MRLCheck RDV100:10
86127:30OBDH/ MRLCheck RNCEV100:10
87127:20OBDH/ MRLCheck RMOxOV100:10
88127:10OBDH/ MRLCheck RMOxSV100:10
89127:00OBDH/ MRLDisable RNCEV100:10
90125:00MRLConfirm MBV closed1
91125:00EGSEConfirm that all valve switches are in OFF position (Except OxDV & HPDV)100:10
92115:00MRL/ EGSECheck loadcell by applying force to it100:20
93114:40OBDHCheck RHPPT shows atmosphere1
94114:40OBDHCheck ROxTPT shows atmosphere1
95114:40OBDHCheck RIHPT shows atmosphere1
96114:40OBDHCheck RCCPT shows atmosphere1
97114:40OBDHCheck RBaro1 shows atmosphere1
98114:40OBDHCheck RBaro2 shows atmosphere1
99114:40EGSECheck HPPT1 shows 0 bar100:20
100114:20EGSECheck HPPT2 shows 0 bar1
101114:20EGSECheck HPLPT shows 0 bar1
102114:20EGSECheck OxInPT1 shows 0 bar1
103114:20EGSECheck OxInPT2 shows 0 bar1
104114:20EGSECheck OxOutPT shows 0 bar100:20
105114:00EGSE/ MRLSwitch on N2O coupling & check if magnetic valve LED is on1
106114:00EGSE/ MRLSwitch on He coupling & check if magnetic valve LED is on1
107114:00EGSE/ MRLSwitch on swivle arm & check if magnetic valve LED is on1
108114:00EGSESwitch off swivel arm & He coupling & N2O coupling101:00
109114:00MCCBEGIN SEQUENCE: Ignition signal TestIgnition signal Test101:00
110113:00MRLConfirm that Ignition Umbilical is disconnected1
111113:00MRLConnect Ignition test receptical1
112113:00EGSE @MRLPlug in Bridges B1 and B21
113113:00MRLConfirm Soundsignal from Ignition Umbilical1
114113:00EGSETurn on Ignition Secure Switch1
115113:00EGSE/ OBDHTurn on Ignition Switch for 2 Second & Confirm ignition signal received at sbRio & cRio1
116113:00EGSEConfirm that Ignition Switch is switched OFF and secured1
117113:00EGSETurn off Ignition Secure Switch1
118113:00EGSE @MRLRemove Bridges B1 and B21
119113:00MRLRemove Ignition test receptical103:00
120113:00MRLRemove Ignition test receptical103:00
121110:00MCCBEGIN SEQUENCE: Ground segment pressure test (PHASE YELLOW) GSE Pressure Test2LuF, AlS, LeD: 1x Helm, 3x Ear protectorsChB, FiH, JuL, LiA, MiS
122130:50EGSE/ MRLCheck Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD200:10
123130:40EGSE/ MRLCheck Water Temperatures @ OxWT1, OxWT2, HPWT2200:10
124109:00MRLConfirm He bottle 1 connector is attached2
125109:00MRLConfirm He bottle 2 connector is attached2
126109:00MRLConfirm N2O bottle 1 connector is attached2
127109:00MRLConfirm N2O bottle 2 connector is attached2
128109:00MRLConfirm hose between HPSM & N2OSM is connected on both ends2
129109:00MRLConfirm hose between HPSM & Flight Segment is connected on both ends2
130109:00MRLConfirm hose between N2OSM & Flight Segment is connected on both ends2
131109:00MRLConfirm pneumatic hose is connected on both ends202:00
132107:00MRLPut on safety equipment2
133107:00MRLConfirm MBV is closed2
134107:00MRLConfirm HPNV1 is closed2
135107:00MRLConfirm HPNV2 is closed2
136107:00MRLTake positions to open He Bottle 12
137107:00EGSEConfirm HPV1 is closed2
138107:00EGSEConfirm MPV1/2 is closed2
139107:00MRLOpen He Bottle 1201:00
140106:00MRLCheck & compare pressure HPPT1 with HPPG1 (max 300 bar)2
141106:00MRLCheck Gastech Silver HPPR1 (max 300 to 50 bar)2
142106:00MRLCheck Harris PPR (50 to 8 bar)2
143106:00MRLCheck pneumatic PPG (8 bar)2
144106:00MRLStep back201:00
145105:00EGSE/ MRLOpen & Close HPV1 SHORTLY & Check HPPT12
146105:00EGSECheck HPPT1 300 Bar2
147105:00EGSEConfirm HPLPT 0 Bar2
148105:00EGSE/ MRLOpen & Close HPV2 SHORTLY & Confirm HPPT2 0 bar2
149105:00EGSE/ MRLOpen & Close HPDV SHORTLY & Confirm HPLPT 0 bar2
150105:00EGSE/ MRLOpen & Close OxV1 SHORTLY2
151105:00EGSE/ MRLOpen & Close OxV2 SHORTLY2
152105:00EGSE/ MRLOpen & Close OxDV SHORTLY2
153105:00EGSE/ MRLOpen & Close MPV3 SHORTLY2
1540:00MRLOpen HPNV1 completely2
1550:00MRLStep Back2
1560:00EGSEOpen & Close HPV1 STEPWISE untile HPLPT equal to HPPT1 and check for leakage @HPLPT (If leakage occurs proceed to passivation Procedure out of sequence)2
1570:00EGSEClose HPV12
1580:00EGSEOpen HPDV & confirm HPLPT 0 Bar2
1590:00EGSEOpen HPV2 & confirm HPPT2 0 Bar2
1600:00EGSEClose HPV22
1610:00EGSEClose HPDV2
16287:10EGSEOpen & Close STEPWISE MPV1/2 to 50 Bar @ OxInPT1 & OxInPT22
16387:10EGSEConfirm MPV1/2 closed2
16487:10EGSEOpen OxDV2
16587:10EGSEOpen & Close STEPWISE MPV3 to 0 Bar @OxOutPT2
16687:10EGSECheck OxInPT1 and OxInPT2 for leakage (If leakage occurs proceed to passivation Procedure out of sequence)2
16787:10EGSEConfirm MPV3 closed2
16887:10EGSEOpen & Close STEPWISE OxV1 to 0 Bar @OxInPT12
16987:10EGSEOpen & Close STEPWISE OxV2 to 0 Bar @OxInPT22
17087:10EGSEConfirm OxOutPT 0 Bar2
17187:10EGSEClose OxDV2
172105:00EGSEConfirm HPLPT & OxOutPT 0 Bar201:30
173103:30EGSEDecouple N2O coupling2
174103:30EGSEDecouple Helium coupling200:20
175103:10EGSEMove arm away from rocket2
176103:10EGSEMove arm to rocket201:00
177102:10MRLClose He Bottle 1 and check HPSM for leakage (If leakage occurs proceed to passivation Procedure out of sequence)201:00
178101:10MRLOpen MBV2
179101:10EGSE/ MRLCheck and compare pressure HPPT1 with HPPG1 0 Bar2
180101:10MRLClose MBV200:30
181100:40MRLSafety is ensured2
182100:40MCCEGSE @MRL to MRL1
183100:40EGSESwitch OFF N20 coupling1
184100:40EGSESwitch OFF He coupling1
185100:40MRLConfirm working personel is grounded101:00
186100:40MRLConfirm PPG 0 Bar100:20
187100:40MRLRelease Pneumatic lines of couplings100:20
188100:20EGSEConfirm Fueling arm is switched OFF1
189100:20EGSEConfirm OxOutPT and HPLPT 0 bar1
190100:20MRLCouple He coupling100:30
19199:50MRLCouple N2O coupling100:30
19299:50MRLConfirm He coupling is connected properly1
19399:50MRLConfirm N2O coupling is connected properly1
194130:50EGSE/ MRLCheck Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD100:10
195130:40EGSE/ MRLCheck Water Temperatures @ OxWT1, OxWT2, HPWT2100:10
19699:20MRLHOLDHOLD1
19799:20MCCCONTINUE AFTER HOLD1
19899:20MRLBEGIN SEQUENCE: On Board System TestOn Board System Test2
199130:50EGSE/ MRLCheck Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD100:10
200130:40EGSE/ MRLCheck Water Temperatures @ OxWT1, OxWT2, HPWT2100:10
20199:40OBDHCheck RDV200:10
20299:30OBDHCheck RNCEV200:10
20399:20OBDHCheck RMOxOV200:10
20499:10OBDHCheck RMOxSV200:10
20599:00OBDHDisable RNCEV200:10
2060:00MRLConfirm working personel is grounded201:00
2070:00OBDHDisconnect from sbRio1
2080:00EGSETurn ON EPS_BAT (Rocket OFF)201:00
2090:00EGSE @MRLInsert EPS RADIO SILENCE Bridge (3R)1
2100:00EGSE @MRLInsert MAIN_BAT Bridge (3L)1
2110:00EGSE @MRLConfirm MAIN_BAT LED is ON1
2120:00EGSE @MRLInsert OBC2_BAT Bridge (4L)1
2130:00EGSE @MRLConfirm OBC2_BAT LED is ON1
2140:00EGSE @MRLInsert RECOVERY_BAT Bridge (7L)1
2150:00EGSE @MRLConfirm RECOVERY_BAT LED is ON1
2160:00EGSE @MRLInsert PAYLOAD1 Bridge (5L)1
2170:00EGSE @MRLConfirm PAYLOAD1 LED is OFF1
2180:00EGSE @MRLInsert PAYLOAD2 Bridge (6L)1
2190:00EGSE @MRLConfirm PAYLOAD2 LED is ON1
2200:00EGSE @MRLConfirm MAIN_BUS LED is OFF1
2210:00EGSE @MRLRemove EPS RADIO SILENCE Bridge (3R)1
2220:00EGSETurn OFF EPS_BAT (Rocket ON)201:00
2230:00EGSE @MRLConfirm MAIN_BUS LED is ON1
2240:00EGSE @MRLConfirm 1 beep at Telemega1
2250:00EGSE @MRLRemove BLACKBOX2 RADIO SILENCE Bridge (3R)1
226139:50OBDHConnect to sbRio using remote Access utility1
227139:50MRLConfirm 3 beeps at OBC11
228139:50OBDHOpen RT_Sub_HMI1
229139:50OBDHConfirm Main Chute button is disabled1
230135:40OBDHCheck EPS hardware Voltages100:10
2310:00EGSECheck EGSE Currents100:10
232125:30PYLConfirm CanSat is running300:20
233125:30PYLConfirm BlackBox2 is running3
2340:00OBDHDisconnect from sbRio1
23599:20EGSETurn ON EPS_BAT (Rocket OFF)201:00
23699:20MRLBEGIN SEQUENCE: Prime RocketPrime Rocket2
23799:20EGSEConfirm EPS_BAT is ON (Rocket OFF)201:00
23899:20MRLConfirm working personel is grounded201:00
23999:20MRLConfirm that RMDV is closed201:00
24099:00MRLClose & secure HP maintenance cover201:00
24199:00MRLClose & secure MainOX maintenance cover201:00
24298:50MRLTurn on GoPro Camera at end of Launch Rail200:20
243141:20EGSE @MRLConfirm ALL 8 bridges on the right side are removed1
244141:20EGSE @MRLConfirm ALL 8 bridges on the left side are inserted1
24595:30MRLClose & secure bridge maintenance cover200:20
24699:20MRLConfirm spring retracted cover at He coupling is moving freely2
24799:20MRLConfirm spring retracted cover at N2O coupling is moving freely2
24895:00MRLConfirm that HP maintenance cover is closed & secured201:00
24995:30MRLConfirm bridge maintenance cover is closed & secured200:20
25095:00MRLConfirm that MainOX maintenance cover is closed & secured201:00
25195:10EGSE @MRLLeave MRL & return to MCC2
25299:20MRLConnect Ignition Umbilical200:30
25395:10OPSElevate MRL to 90 degrees205:00
25489:40EGSEZero OxTank Mass201:00
25588:40MCCBEGIN SEQUENCE: Fueling Preparations (PHASE YELLOW)Fueling Preparations2
256130:50EGSE/ MRLCheck Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD200:10
257130:40EGSE/ MRLCheck Water Temperatures @ OxWT1, OxWT2, HPWT2200:10
25888:40MRLPut on safety equipment200:30
25910:10MRLConfirm HPNV1 is Open2
26010:10MRLConfirm HPNV2 is Closed2
26188:10MRLOpen He Bottle 1201:00
26287:10MRLStep back2
2630:00EGSEOpen & Close HPV1 STEPWISE untile HPLPT equal to HPPT1 and check for leakage @HPLPT (If leakage occurs continue with "GSE Passivation Procedure")2
2640:00EGSEOpen HPV12
2650:00EGSEOpen & Close HPV2 STEPWISE untile HPPT2 equal to HPLPT and check for leakage @HPPT2 (If leakage occurs continue with "GSE Passivation Procedure")2
2660:00EGSEClose HPV12
2670:00EGSEOpen HPDV & Confirm HPLPT 0 Bar2
2680:00EGSEConfirm HPV1 is closed2
2690:00EGSEConfirm HPV2 is closed2
27010:10MRLOpen HPNV2 1/8 Rev2
2710:00EGSEClose HPDV2
27287:10EGSEOpen & Close STEPWISE MPV1/2 to 50 Bar @ OxInPT1 & OxInPT22
27387:10EGSE/ MRLCheck & compare OxInPT1 with OxInPG1 based on Bottle temperature (max 50 bar)2
27487:10EGSE/ MRLCheck & compare pressure OxInPT2 with OxInPG2 based on Bottle temperature (max 50 bar)2
27587:10EGSE/ MRLCheck Temperature of N2O Bottle 1 @OxT1 & OxWT1 (max 22C)2
27687:10EGSE/ MRLCheck Temperature of N2O Bottle 2 @OxT2 & OxWT2 (max 22C)201:30
27785:40MRLOpen He Bottle 22
27885:40EGSE/ MRLCheck & compare pressure HPPT2 with HPPG2 (max 315 bar)201:00
27984:40ALL/ MRLCAUTION!2
28084:40MRLOpen N2O Bottle 12
28184:40MRL/ EGSECheck & compare pressure OxInPT 1 with OxInPG 1 (max 50 bar)202:00
28282:40MRLOpen N2O Bottle 22
28382:40MRL/ EGSECheck & compare pressure OxInPT 2 with OxInPG 2 (max 50 bar)202:00
28480:40MRLInsert Ignition Bridges B1 and B2 into EGSE202:00
28578:40MRLConfirm Soundsignal from Ignition Umbilical2
28678:40MRLClose ComTerm & Go to Block House2
28778:40MCCTurn OFF MRL confirm lock2
28878:40ALLInform OPS to clear Launch Pad (Tel.: [!!!])202:00
289147:20WINDStart wind weighting analysis2
290130:50EGSE/ MRLCheck Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD200:10
291130:40EGSE/ MRLCheck Water Temperatures @ OxWT1, OxWT2, HPWT2200:10
29268:40MCCHOLDHOLD2
29368:40KLPStart Camera Karsten Lapp<70>hn2
29468:40MCCCONTINUE AFTER HOLD2
295130:50EGSE/ MRLCheck Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD200:10
296130:40EGSE/ MRLCheck Water Temperatures @ OxWT1, OxWT2, HPWT2200:10
297130:40EGSEConfirm storage capacity of CRio is greater than 300MB200:10
298127:00OBDHConfirm RNCEV is disabled200:10
29968:40MCCBEGIN SEQUENCE Ox Fueling (PHASE RED)Ox Fueling (PHASE RED)3
30068:50WINDReport on weather situation3
30168:40MCCAnnounce end of Radio Silence3
30268:40EGSETurn OFF EPS_BAT (Rocket ON)3
3030:00OBDHConnect to sbRio using remote Access utility1
3040:00MCCConfirm 3 beeps at OBC11
3050:00OBDHOpen RT_Sub_HMI1
3060:00OBDHConfirm Main Chute button is disabled1
3070:00OBDHCheck EPS hardware Voltages100:10
3080:00EGSECheck EGSE Currents100:10
309126:50OBDH/ TMTCConfirm RF451-Link300:20
310126:30TMTCConfirm GPS-lock300:20
311126:10TMTCConfirm Telemega-Link300:20
312125:50OBDHTest Connection to STX3300:20
313125:30OBDHConfirm that STX3 Packages are received by email300:30
314125:30AVCTurn on main TMTC screen300:30
315125:30PYLConfirm CanSat is running300:20
316125:30PYLConfirm BlackBox2 is running3
317125:30MCCRequest Permission to begin fueling from OPS303:00
31868:40OBDHAcknowledge start of Fueling301:00
31967:40EGSEOpen & Close HPV1 STEPWISE to 50 Bar @ ROxTPT (stop every 10 bar & check ROxTBT & ROxTTT (approx. ambiente temp)3
32067:40EGSEConfirm OxOutPT 0 Bar to check ROxCV tightness3
32167:40EGSEOpen & Close HPV1 STEPWISE to more than 50 Bar @ RHPPT and confirm ROxTPT 50 Bar3
32267:40EGSEConfirm HPV1 is closed3
32367:40OBDHOpen RDV SHORTLY, to check tightness @ RHPPT & ROxTPT (If leakages occur continue with Abort Procedure)3
32467:40EGSEOpen MPV1/23
32567:40EGSEOpen & Close MPV3 STEPWISE to 50 Bar @ OxOutPT3
32667:40EGSEClose MPV1/23
32767:40EGSECheck & compare OxOutPT with OxInPT13
32867:40EGSECheck if RHPPT & ROxTPT more than OxInPT1, If less Open & Close HPV13
32967:40EGSEZero OxTank Mass3
33067:40MCCWrite down Time3
33167:40EGSEOpen OxV1304:00
33263:40OBDHOpen & Close RDV STEPWISE until N2O bottle empty or 25kg OxTankMass, keep temperatures RDVT and RDVET above 10<31>C and Check delta ROxTPT and OxInPT1330:00:00
33333:40EGSEVerify Bottle Temperatures @ OxT1, OxT2, HPT2300:10
33433:40EGSEVerify Water Temperatures @ Ox@T1, OxWT2, HPWT2300:10
33533:40EGSEClose OxV1300:10
33633:30EGSECheck if Pressure rises in OxPT1, if Pressure rises relief via OxV1 or wait for Pressure relief valve301:00
33732:30EGSECheck & compare OxOutPT with OxInPT23
33832:30EGSECheck & compare RHPPT & ROxTPT 50 Bar and more than OxInPT2, If less Open & Close HPV13
33932:30EGSEOpen OxV2 3
34032:30OBDHOpen & Close RDV STEPWISE to 25kg OxTankMass, keep temperatures RDVT and RDVET above 10<31>C and Check delta OxTPT and OxInPT1320:00
34112:30EGSEClose OxV2 300:10
34212:20EGSECheck if Pressure rises in OxPT2, if Pressure rises relief via OxV2 or wait for Pressure relief valve301:00
34311:20EGSEOpen OxDV STEPWISE until OxOutPT 0 Bar3
34411:20OBDHCheck ROxCV for tightness @ ROxTPT3
34511:20EGSEClose OxDV301:00
34610:20EGSEWrite down OxTankMass3
34733:40EGSEVerify He Bottle 2 Temperature @HPT2 & @HPWT2 (turn ON He_Heater if necessary) 300:10
34810:20MCCProvide OxTankMass and temperature readings to Wind weighting station300:30
3499:50EGSEConfirm OxV1 & OxV2 closed3
3509:50EGSEConfirm OxOutPT 0 Bar3
3519:50EGSEDecouple N2O coupling300:20
3529:30MCCConfirm End of Oxidator Fueling to OPS300:15
3539:20WINDStart wind weighting analysis3
3549:15OBDH/ TMTCCheck RF451-Link300:20
3558:55TMTCCheck GPS-lock300:20
3568:35TMTCCheck Telemega-Link300:20
35733:40EGSEVerify He Bottle 2 Temperature @HPT2 & @HPWT2 (turn ON/OFF He_Heater if necessary) 300:10
3588:15MCCHOLD (Last possible scheduled HOLD)HOLD3
3598:15OPSAlign MRL to Launch Trajectory3
3608:15MCCTurn audio volume down3
3618:15MCCTurn OFF ComTerm step delay3
3628:15ALLTalk through Ignition Sequence3
3638:15MCCWait for OPS to confirm final MRL adjustment3
3648:15WINDReport on weather situation3
3658:15MCCCONTINUE AFTER HOLD3
3668:15AVCStart Video recording in Block House3
3678:15EGSEVerify He Bottle 2 Temperature @HPT2 & @HPWT2 (turn ON/OFF He_Heater if necessary) 300:10
3688:15MCCBEGIN SEQUENCE: Switching to Internal Power SequenceSwitch to Internal Power3
3698:15EGSETurn OFF EPS_Ext (Switch to internal Power)300:20
3707:55OBDHConfirm EPS Voltages are within limits300:10
3717:45OBDHConfirm RF451 Transmitting300:05
3727:40OBDH/ TMTCConfirm RF451-Link300:20
3737:20TMTCConfirm GPS-lock300:20
3747:00TMTCConfirm Telemega-Link300:20
3756:40OBDHSwitch to PREARMED300:10
3766:30PYLConfirm Payload is running300:20
3776:30PYLConfirm BlackBox2 is ready for launch3
3786:10AVCConfirm that videorecording @ MCC is running300:05
3796:05MCCBEGIN SEQUENCE: High Pressure FuelingHigh Pressure Fueling3
38033:40EGSEVerify He Bottle 2 Temperature @HPT2 & @HPWT2 (turn ON/OFF He_Heater if necessary) 300:10
3816:05EGSEOpen & Close HPV1 STEPWISE until RHPPT 300 Bar or pressure equal to He Bottle 13
3826:05EGSEOpen & Close HPV2 STEPWISE until RHPPT 300 Bar 3
3836:05EGSEOpen & close HPDV STEPWISE until HPLPT 0 Bar 3
3846:05EGSEConfirm HPDV closed3
3856:05OBDH/ EGSECheck for leakage & HPLPT 0 Bar & RHPPT 300 Bar 302:00
3866:05EGSETurn OFF He_Heater3
3874:05OBDHAcknowledge end of Fueling300:10
3883:55MCCConfirm End of Fueling to OPS300:20
3893:35MCCBEGIN SEQUENCE: Disconnecting Fueling ArmDisconnecting Fueling Arm300:10
3903:25EGSEConfirm HPV1 & HPV2 closed300:10
3913:15EGSEConfirm HPLPT 0 Bar 300:10
3923:05EGSEDecouple Helium coupling300:20
3932:45EGSEConfirm Helium coupling is disconnected300:10
3942:35EGSEMove fueling arm away from rocket300:40
3951:55MCCConfirm Fueling Arm away to OPS300:15
3961:40MCCPrepare for Launch300:10
3971:30OBDHConfirm ready for launch300:10
3981:20EGSEConfirm ready for launch300:10
3991:10MCCSet Go/No-Go System to Go300:10
4001:00MCCWait for Authorization for Launch300:00
4011:00MCCBEGIN SEQUENCE: IgnitionIgnition Sequence300:10
4020:50OBDHT-50 ARM300:05
4030:40OBDHT-40 Confirm all status indicators green300:05
4040:30OBDHT-30 Disconnect from sbRio300:30
4050:10EGSET-10 Turn on Ignition Secure300:07
4060:03EGSET-3: Ignition300:03
4070:00OBDHT+0: Verify RMOxOV Open (Launched)300:00
4080:00EGSET+1: Turn OFF Ignition3
4090:00EGSET+5: Turn OFF Ignition Secure3
4100:00OBDHT+20: Verify RMOxOV Closed and RMOxSV Open (Cruise)3
4110:00OBDHT+50: Verify RNCEV Open (Drogue)3
4120:00OBDHT+310: Verify Main Chute Deployed and RDV Open (Main)3
4130:00OBDHT+600: Verify (Landed)3
4140:00MCCBEGIN SEQUENCE: PASSIVATION (PHASE YELLOW)Passivation2
41568:40MCCAnnounce BEGIN of Radio Silence2
4160:00MCCTurn audio volume up2
4170:00MRLGo to MRL, THEN...2
4180:00MRLClose N2O Bottle 1 & N2O Bottle 2, THEN...2
4190:00MRLRETURN to Block House2
4200:00EGSEOpen OxDV2
4210:00EGSEOpen OxV12
4220:00EGSEConfirm OxInPT1 & OxOutPT 0 Bar2
4230:00EGSEClose OxV12
4240:00EGSEOpen OxV22
4250:00EGSEConfirm OxInPT2 & OxOutPT 0 Bar2
4260:00EGSEClose OxV22
4270:00EGSEClose OxDV2
4280:00MRLGo to MRL, confirm OxInPG1 & OxInPG2 0 Bar, else RETURN to Block House, THEN...2
4290:00MRLClose He Bottle 2, THEN...2
4300:00MRLWrite down remaining Pressure of He Bottle 2, THEN...2
4310:00MRLReturn to Block House2
4320:00EGSEOpen HPDV2
4330:00EGSEOpen HPV22
4340:00EGSEConfirm pressure HPLPT & HPPT2 0 Bar2
4350:00EGSEClose HPV22
4360:00EGSEClose HPDV2
4370:00MRLGo to Testrig, confirm HPPG2 0 Bar, else return to Block House, THEN...2
4380:00MRLClose He Bottle 1, THEN ...2
4390:00MRLOpen ComTerm2
4408:15MCCTurn ON ComTerm step delay2
4410:00MRLWrite down remaining Pressure of He Bottle 12
4420:00MRLStep back2
4430:00EGSEOpen HPDV2
4440:00EGSEOpen HPV12
4450:00EGSEConfirm pressure HPLPT & HPPT1 0 Bar2
4460:00EGSEClose HPV12
4470:00EGSEClose HPDV2
4480:00EGSEPressure Check2
4490:00MRLOpen MBV2
4500:00EGSE/ MRLCheck and compare pressure HPPT1 with HPPG12
4510:00MRLClose MBV2
4520:00MRLTake out B1 & B2 Bridges2
4530:00MRLSafety is ensured2
4540:00MCCConfirm to OPS that Safety is ensured2
4550:00MCCBEGIN SEQUENCE: Data collectionData collection1
4560:00AVCTurn off GoPro & Camcorder & Stop Block House Video recording1
4570:00EGSECopy PID.vi.tdms & save to new name1
4580:00EGSEWait for buffer storage process to be finished1
4590:00EGSEsave data files from cRio to PC1
4600:00WINDSave data on external HDD1
4610:00TMTCStop TMTC Vi and save data on external HDD1
4620:00AVCEnd audio recording1
4630:00MCCStop ComTerm and save logfile to external HDD, THEN...1
4640:00MCCRestart ComTerm VI1
4650:00AVCSave video & audio data on external HDD1
4660:00MCCEND OF PROCEDUREEnd1