added hatches and last valve checks to priming rocket sequence

This commit is contained in:
Finn 2020-06-06 12:50:55 +02:00
parent cee9bc59b3
commit a75a1db781
3 changed files with 15 additions and 12 deletions

View File

@ -1,4 +1,4 @@
vers.;v4.23;Abort Procedure;;3;mrl;mcc;rdh;time vers.;v4.25;Abort Procedure;;3;mrl;mcc;rdh;time
0:00;MCC;BEGIN SEQUENCE: Defueling Rocket;Defueling;3;;;; 0:00;MCC;BEGIN SEQUENCE: Defueling Rocket;Defueling;3;;;;
0:00;MCC;Inform OPS of Launch Abort;;3;;;; 0:00;MCC;Inform OPS of Launch Abort;;3;;;;
0:00;EGSE;Confirm all valve switches are in OFF position (Except OxDV & HPDV);;3;;;; 0:00;EGSE;Confirm all valve switches are in OFF position (Except OxDV & HPDV);;3;;;;

1 vers. v4.23 v4.25 Abort Procedure 3 mrl mcc rdh time
2 0:00 MCC BEGIN SEQUENCE: Defueling Rocket Defueling 3
3 0:00 MCC Inform OPS of Launch Abort 3
4 0:00 EGSE Confirm all valve switches are in OFF position (Except OxDV & HPDV) 3

View File

@ -1,4 +1,4 @@
vers.;v4.23;Launch Procedure;;0;MRL;MCC;RdHill;Time per step vers.;v4.25;Launch Procedure;;0;MRL;MCC;RdHill;Time per step
147:20;MCC;BEGIN SEQUENCE: Power on EGSE;Power on EGSE;1;;;; 147:20;MCC;BEGIN SEQUENCE: Power on EGSE;Power on EGSE;1;;;;
147:20;WIND;Start wind weighting analysis;;1;;;; 147:20;WIND;Start wind weighting analysis;;1;;;;
147:20;EGSE;Check CLD connection;;1;;;; 147:20;EGSE;Check CLD connection;;1;;;;
@ -117,7 +117,6 @@ vers.;v4.23;Launch Procedure;;0;MRL;MCC;RdHill;Time per step
110:00;MCC;BEGIN SEQUENCE: Ground segment pressure test (PHASE YELLOW) ;GSE Pressure Test;2;LuF, AlS, LeD: 1x Helm, 3x Ear protectors;ChB, FiH, JuL, LiA, MiS;; 110:00;MCC;BEGIN SEQUENCE: Ground segment pressure test (PHASE YELLOW) ;GSE Pressure Test;2;LuF, AlS, LeD: 1x Helm, 3x Ear protectors;ChB, FiH, JuL, LiA, MiS;;
130:50;EGSE/ MRL;Check Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD;;2;;;;00:10 130:50;EGSE/ MRL;Check Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD;;2;;;;00:10
130:40;EGSE/ MRL;Check Water Temperatures @ OxWT1, OxWT2, HPWT2;;2;;;;00:10 130:40;EGSE/ MRL;Check Water Temperatures @ OxWT1, OxWT2, HPWT2;;2;;;;00:10
110:00;MRL;Confirm that all hatches are closed;;2;;;;01:00
109:00;MRL;Confirm He bottle 1 connector is attached;;2;;;; 109:00;MRL;Confirm He bottle 1 connector is attached;;2;;;;
109:00;MRL;Confirm He bottle 2 connector is attached;;2;;;; 109:00;MRL;Confirm He bottle 2 connector is attached;;2;;;;
109:00;MRL;Confirm N2O bottle 1 connector is attached;;2;;;; 109:00;MRL;Confirm N2O bottle 1 connector is attached;;2;;;;
@ -200,24 +199,28 @@ vers.;v4.23;Launch Procedure;;0;MRL;MCC;RdHill;Time per step
130:50;EGSE/ MRL;Check Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD;;1;;;;00:10 130:50;EGSE/ MRL;Check Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD;;1;;;;00:10
130:40;EGSE/ MRL;Check Water Temperatures @ OxWT1, OxWT2, HPWT2;;1;;;;00:10 130:40;EGSE/ MRL;Check Water Temperatures @ OxWT1, OxWT2, HPWT2;;1;;;;00:10
99:20;MRL;BEGIN SEQUENCE: Prime Rocket;Prime Rocket;2;;;; 99:20;MRL;BEGIN SEQUENCE: Prime Rocket;Prime Rocket;2;;;;
99:20;EGSE;Turn ON EPS_BAT;;2;;;;01:00 99:40;OBDH;Check RDV;;2;;;;00:10
99:30;OBDH;Check RNCEV;;2;;;;00:10
99:20;OBDH;Check RMOxOV;;2;;;;00:10
99:10;OBDH;Check RMOxSV;;2;;;;00:10
99:00;OBDH;Disable RNCEV;;2;;;;00:10
99:20;EGSE;Turn ON EPS_BAT (Rocket OFF);;2;;;;01:00
99:20;MRL;Confirm working personel is grounded;;2;;;;01:00 99:20;MRL;Confirm working personel is grounded;;2;;;;01:00
99:20;MRL;Confirm all spring retracted hatches are moving freely;;2;;;; 110:00;MRL;Confirm that HP maintenance cover is closed & secured;;2;;;;01:00
110:00;MRL;Confirm that MainOX maintenance cover is closed & secured;;2;;;;01:00
99:20;MRL;Confirm spring retracted cover at He coupling is moving freely;;2;;;;
99:20;MRL;Confirm spring retracted cover at N2O coupling is moving freely;;2;;;;
98:50;MRL;Turn on GoPro Camera at end of Launch Rail;;2;;;;00:20 98:50;MRL;Turn on GoPro Camera at end of Launch Rail;;2;;;;00:20
99:20;MRL;Connect Ignition Umbilical;;2;;;;00:30 99:20;MRL;Connect Ignition Umbilical;;2;;;;00:30
98:30;MRL;Insert all EPS Bridges;;2;;;;03:00 98:30;MRL;Insert all EPS Bridges;;2;;;;03:00
95:30;MRL;Confirm Bridge Hatch is Secured;;2;;;;00:20 95:30;MRL;Close bridge maintenance cover;;2;;;;00:20
95:30;MRL;Confirm bridge maintenance cover is closed & secured;;2;;;;00:20
95:10;EGSE @MRL;return to MCC;;2;;;; 95:10;EGSE @MRL;return to MCC;;2;;;;
95:10;OPS;Elevate MRL to 90 degrees;;2;;;;05:00 95:10;OPS;Elevate MRL to 90 degrees;;2;;;;05:00
89:40;EGSE;Zero OxTank Mass;;2;;;;01:00 89:40;EGSE;Zero OxTank Mass;;2;;;;01:00
88:40;MCC;BEGIN SEQUENCE: Fueling Preparations (PHASE YELLOW);Fueling Preparations;2;;;; 88:40;MCC;BEGIN SEQUENCE: Fueling Preparations (PHASE YELLOW);Fueling Preparations;2;;;;
130:50;EGSE/ MRL;Check Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD;;2;;;;00:10 130:50;EGSE/ MRL;Check Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD;;2;;;;00:10
130:40;EGSE/ MRL;Check Water Temperatures @ OxWT1, OxWT2, HPWT2;;2;;;;00:10 130:40;EGSE/ MRL;Check Water Temperatures @ OxWT1, OxWT2, HPWT2;;2;;;;00:10
127:40;OBDH;!!!Check RDV;;2;;;;00:10
127:30;OBDH;!!!Check RNCEV;;2;;;;00:10
127:20;OBDH;!!!Check RMOxOV;;2;;;;00:10
127:10;OBDH;!!!Check RMOxSV;;2;;;;00:10
127:00;OBDH;!!!Disable RNCEV;;2;;;;00:10
88:40;MRL;Put on safety equipment;;2;;;;00:30 88:40;MRL;Put on safety equipment;;2;;;;00:30
10:10;MRL;Confirm HPNV1 is Open;;2;;;; 10:10;MRL;Confirm HPNV1 is Open;;2;;;;
10:10;MRL;Confirm HPNV2 is Closed;;2;;;; 10:10;MRL;Confirm HPNV2 is Closed;;2;;;;

1 vers. v4.23 v4.25 Launch Procedure 0 MRL MCC RdHill Time per step
2 147:20 MCC BEGIN SEQUENCE: Power on EGSE Power on EGSE 1
3 147:20 WIND Start wind weighting analysis 1
4 147:20 EGSE Check CLD connection 1
117 110:00 MCC BEGIN SEQUENCE: Ground segment pressure test (PHASE YELLOW) GSE Pressure Test 2 LuF, AlS, LeD: 1x Helm, 3x Ear protectors ChB, FiH, JuL, LiA, MiS
118 130:50 EGSE/ MRL Check Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD 2 00:10
119 130:40 EGSE/ MRL Check Water Temperatures @ OxWT1, OxWT2, HPWT2 2 00:10
110:00 MRL Confirm that all hatches are closed 2 01:00
120 109:00 MRL Confirm He bottle 1 connector is attached 2
121 109:00 MRL Confirm He bottle 2 connector is attached 2
122 109:00 MRL Confirm N2O bottle 1 connector is attached 2
199 130:50 EGSE/ MRL Check Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD 1 00:10
200 130:40 EGSE/ MRL Check Water Temperatures @ OxWT1, OxWT2, HPWT2 1 00:10
201 99:20 MRL BEGIN SEQUENCE: Prime Rocket Prime Rocket 2
202 99:20 99:40 EGSE OBDH Turn ON EPS_BAT Check RDV 2 01:00 00:10
203 99:30 OBDH Check RNCEV 2 00:10
204 99:20 OBDH Check RMOxOV 2 00:10
205 99:10 OBDH Check RMOxSV 2 00:10
206 99:00 OBDH Disable RNCEV 2 00:10
207 99:20 EGSE Turn ON EPS_BAT (Rocket OFF) 2 01:00
208 99:20 MRL Confirm working personel is grounded 2 01:00
209 99:20 110:00 MRL Confirm all spring retracted hatches are moving freely Confirm that HP maintenance cover is closed & secured 2 01:00
210 110:00 MRL Confirm that MainOX maintenance cover is closed & secured 2 01:00
211 99:20 MRL Confirm spring retracted cover at He coupling is moving freely 2
212 99:20 MRL Confirm spring retracted cover at N2O coupling is moving freely 2
213 98:50 MRL Turn on GoPro Camera at end of Launch Rail 2 00:20
214 99:20 MRL Connect Ignition Umbilical 2 00:30
215 98:30 MRL Insert all EPS Bridges 2 03:00
216 95:30 MRL Confirm Bridge Hatch is Secured Close bridge maintenance cover 2 00:20
217 95:30 MRL Confirm bridge maintenance cover is closed & secured 2 00:20
218 95:10 EGSE @MRL return to MCC 2
219 95:10 OPS Elevate MRL to 90 degrees 2 05:00
220 89:40 EGSE Zero OxTank Mass 2 01:00
221 88:40 MCC BEGIN SEQUENCE: Fueling Preparations (PHASE YELLOW) Fueling Preparations 2
222 130:50 EGSE/ MRL Check Bottle Temperatures @ OxT1, OxT2, HPT2. If above 30C aknowledge high temperature. If above 35C enter HOLD 2 00:10
223 130:40 EGSE/ MRL Check Water Temperatures @ OxWT1, OxWT2, HPWT2 2 00:10
127:40 OBDH !!!Check RDV 2 00:10
127:30 OBDH !!!Check RNCEV 2 00:10
127:20 OBDH !!!Check RMOxOV 2 00:10
127:10 OBDH !!!Check RMOxSV 2 00:10
127:00 OBDH !!!Disable RNCEV 2 00:10
224 88:40 MRL Put on safety equipment 2 00:30
225 10:10 MRL Confirm HPNV1 is Open 2
226 10:10 MRL Confirm HPNV2 is Closed 2

View File

@ -1,4 +1,4 @@
vers.;v4.23;Passivation out of sequence Procedure;;2;mrl;mcc;rdh;time vers.;v4.25;Passivation out of sequence Procedure;;2;mrl;mcc;rdh;time
0:00;MCC;BEGIN SEQUENCE: Prepare Passivation Sequence;Prepare Passivation;2;;;; 0:00;MCC;BEGIN SEQUENCE: Prepare Passivation Sequence;Prepare Passivation;2;;;;
0:00;MCC/MRL;Recall and make sure BOTH N2O Bottles & He Bottle 2 are still closed! Else continue with Abort Procedure;;2;;;; 0:00;MCC/MRL;Recall and make sure BOTH N2O Bottles & He Bottle 2 are still closed! Else continue with Abort Procedure;;2;;;;
0:00;MCC;Inform OPS of Passivation out of sequence;;2;;;; 0:00;MCC;Inform OPS of Passivation out of sequence;;2;;;;

1 vers. v4.23 v4.25 Passivation out of sequence Procedure 2 mrl mcc rdh time
2 0:00 MCC BEGIN SEQUENCE: Prepare Passivation Sequence Prepare Passivation 2
3 0:00 MCC/MRL Recall and make sure BOTH N2O Bottles & He Bottle 2 are still closed! Else continue with Abort Procedure 2
4 0:00 MCC Inform OPS of Passivation out of sequence 2