inserted grounding before touching the rocket

This commit is contained in:
Finn 2020-05-28 12:45:03 +02:00
parent 2849f64cc7
commit fdc8038d97
1 changed files with 16 additions and 10 deletions

View File

@ -1,4 +1,4 @@
vers.;v4.5;Launch Procedure;;0;MRL;MCC;RdHill;Time per step;
vers.;v4.7;Launch Procedure;;0;MRL;MCC;RdHill;Time per step;
147:20;MCC;BEGIN SEQUENCE: Power on EGSE;Power on EGSE;1;;;;;
147:20;EGSE;Check CLD connection;;1;;;;;
147:20;EGSE;Switch ON CLD via Battery & check voltage (24 Volt);;1;;;;;
@ -16,12 +16,12 @@ vers.;v4.5;Launch Procedure;;0;MRL;MCC;RdHill;Time per step;
143:20;EGSE;Start RT_VI;;1;;;;;
143:20;EGSE;Confirm PID-VI is running;;1;;;;;
143:20;EGSE;Rename PID-Logfile;;1;;;;02:00;
141:20;MCC;BEGIN SEQUENCE: Connect Data Umbilical;Connect Data Umbilical;1;;;;00:30;
141:20;MRL;Confirm working Personel is grounded;;1;;;;;
141:20;EGSL@MRL;Confirm all 8 Groundingbridges are inserted;;1;;;;;
141:20;MCC;BEGIN SEQUENCE: Connect Data Umbilical;Connect Data Umbilical;1;;;;00:30;
140:50;EGSE;Turn on EPS_BAT;;1;;;;;
140:50;EGSE;Turn on EPS_EXT;;1;;;;;
140:50;EGSE@MRL;Remove 7 Grounding Bridges and leave EPS_BAT inserted;;1;;;;;
140:50;EGSE@MRL;Leave EPS_BAT inserted and remove the other 7 Grounding Bridges;;1;;;;;
140:50;EGSE@MRL;Insert EPS_EXT Fuse in Power Supply Control Panel;;1;;;;;
140:50;EGSE@MRL;Confirm green LED at EPS_EXT Fuse is on;;1;;;;;
140:50;EGSE@MRL;Insert Main_Bus Fuse in Power Supply Control Panel;;1;;;;;
@ -153,18 +153,23 @@ vers.;v4.5;Launch Procedure;;0;MRL;MCC;RdHill;Time per step;
101:10;MRL;Close MBV;;2;;;;00:30;
100:40;MRL;Safety is ensured;;2;;;;;
100:40;MCC;MiS to MRL;;1;;;;;
100:40;EGSE;Switch off N20 coupling;;1;;;;;
100:40;EGSE;Switch off He coupling;;1;;;;;
100:40;EGSE;Switch OFF N20 coupling;;1;;;;;
100:40;EGSE;Switch OFF He coupling;;1;;;;;
100:40;MRL;Confirm working Personel is grounded;;1;;;;01:00;
100:40;MRL;Release Pneumatic lines of couplings;;1;;;;00:20;
100:20;EGSE;Confirm Fueling arm is switched off;;1;;;;;
100:20;EGSE;Confirm Fueling arm is switched OFF;;1;;;;;
100:20;EGSE;Check OxOutPT and HPLPT 0 bar;;1;;;;;
100:20;MRL;Couple Helium coupling;;1;;;;00:30;
100:20;MRL;Couple He coupling;;1;;;;00:30;
99:50;MRL;Couple N2O coupling;;1;;;;00:30;
99:50;MRL;Confirm He coupling is connected properly;;1;;;;;
99:50;MRL;Confirm N2O coupling is connected properly;;1;;;;;
99:20;MRL;HOLD;HOLD;1;;;;;
99:20;EGSE/MRL;Verify Bottle Temperatures @ OxT1, OxT2, HPT2;;1;;;;00:10;
99:20;EGSE/MRL;Verify Water Temperatures @ Ox@T1, OxWT2, HPWT2;;1;;;;00:10;
99:20;MCC;CONTINUE AFTER HOLD;;;;;;;
99:20;MRL;BEGIN SEQUENCE: Arming Rocket Part 1;Arming Rocket Pt.1;1;;;;;
99:20;MRL;Confirm working Personel is grounded;;1;;;;01:00;
99:20;MRL;Confirm all spring retracted hatches are moving freely;;1;;;;;
98:50;MRL;Turn on GoPro Camera at end of Launch Rail;;1;;;;00:20;
99:20;MRL;Connect Ignition Umbilical;;1;;;;00:30;
98:30;MRL;Insert all EPS Bridges;;1;;;;03:00;
@ -222,7 +227,7 @@ vers.;v4.5;Launch Procedure;;0;MRL;MCC;RdHill;Time per step;
67:40;EGSE;Zero OxTank Mass;;3;;;;;
67:40;MCC;Write down Time;;3;;;;;
67:40;EGSE;Open OxV1;;3;;;;04:00;
63:40;OBDH;Open & Close RDV STEPWISE until N2O bottle empty or 25kg OxTankMass, keep temperatures RDVT and RDVET above 10°C and Check delta ROxTPT and OxInPT1;;3;;;;30:00:00;
63:40;OBDH;Open & Close RDV STEPWISE until N2O bottle empty or 25kg OxTankMass, keep temperatures RDVT and RDVET above 10°C and Check delta ROxTPT and OxInPT1;;3;;;;30:00;
33:40;EGSE;Verify Bottle Temperatures @ OxT1, OxT2, HPT2;;1;;;;00:10;
33:40;EGSE;Verify Water Temperatures @ Ox@T1, OxWT2, HPWT2;;1;;;;00:10;
33:40;EGSE;Close OxV1;;3;;;;00:10;
@ -249,9 +254,9 @@ vers.;v4.5;Launch Procedure;;0;MRL;MCC;RdHill;Time per step;
8:15;OPS;Align MRL to Launch Trajectory;;3;;;;;
8:15;MCC;Turn audio volume down;;3;;;;;
8:15;MCC;Turn off Confirm delay;;3;;;;;
8:15;MCC;Confirm MRL adjustment with OPS;;3;;;;;
8:15;ALL;Talk through Launch Sequence;;3;;;;;
8:15;AVC;Start Video Recording in Block House;;3;;;;;
8:15;MCC;Confirm MRL adjustment with OPS;;3;;;;;
8:15;AVC;Start Video recording in Block House;;3;;;;;
8:15;MCC;CONTINUE AFTER HOLD;;;;;;;
8:15;MCC;BEGIN Switching to Internal Power Sequence;Switch to Internal Power;3;;;;;
8:15;EGSE;Switch to internal Power;;3;;;;00:20;
@ -297,6 +302,7 @@ vers.;v4.5;Launch Procedure;;0;MRL;MCC;RdHill;Time per step;
0:00;OBDH;T+310: Verify Main Chute Deployed and RDV Open (Main);;4;;;;;
0:00;OBDH;T+600: Verify (Landed);;4;;;;;
0:00;MCC;BEGIN SEQUENCE: PASSIVATION (PHASE YELLOW) (Write down Time);Passivation;2;;;;;
68:40;MCC;Announce BEGIN of Radio Silence;;3;;;;;
0:00;MCC;Turn audio volume up;;2;;;;;
0:00;TMTC;Check ROxTPT & RHPPT 1 Bar, if more: Open & Close STEPWISE RDV;;2;;;;;
0:00;MRL;Go to Testrig, Close N2O Bottle 1 & N2O Bottle 2 then RETURN to Block House;;2;;;;;

1 vers. v4.5 v4.7 Launch Procedure 0 MRL MCC RdHill Time per step
2 147:20 MCC BEGIN SEQUENCE: Power on EGSE Power on EGSE 1
3 147:20 EGSE Check CLD connection 1
4 147:20 EGSE Switch ON CLD via Battery & check voltage (24 Volt) 1
16 143:20 EGSE Start RT_VI 1
17 143:20 EGSE Confirm PID-VI is running 1
18 143:20 EGSE Rename PID-Logfile 1 02:00
19 141:20 MCC BEGIN SEQUENCE: Connect Data Umbilical Connect Data Umbilical 1 00:30
20 141:20 MRL Confirm working Personel is grounded 1
21 141:20 EGSL@MRL Confirm all 8 Groundingbridges are inserted 1
141:20 MCC BEGIN SEQUENCE: Connect Data Umbilical Connect Data Umbilical 1 00:30
22 140:50 EGSE Turn on EPS_BAT 1
23 140:50 EGSE Turn on EPS_EXT 1
24 140:50 EGSE@MRL Remove 7 Grounding Bridges and leave EPS_BAT inserted Leave EPS_BAT inserted and remove the other 7 Grounding Bridges 1
25 140:50 EGSE@MRL Insert EPS_EXT Fuse in Power Supply Control Panel 1
26 140:50 EGSE@MRL Confirm green LED at EPS_EXT Fuse is on 1
27 140:50 EGSE@MRL Insert Main_Bus Fuse in Power Supply Control Panel 1
153 101:10 MRL Close MBV 2 00:30
154 100:40 MRL Safety is ensured 2
155 100:40 MCC MiS to MRL 1
156 100:40 EGSE Switch off N20 coupling Switch OFF N20 coupling 1
157 100:40 EGSE Switch off He coupling Switch OFF He coupling 1
158 100:40 MRL Confirm working Personel is grounded 1 01:00
159 100:40 MRL Release Pneumatic lines of couplings 1 00:20
160 100:20 EGSE Confirm Fueling arm is switched off Confirm Fueling arm is switched OFF 1
161 100:20 EGSE Check OxOutPT and HPLPT 0 bar 1
162 100:20 MRL Couple Helium coupling Couple He coupling 1 00:30
163 99:50 MRL Couple N2O coupling 1 00:30
164 99:50 MRL Confirm He coupling is connected properly 1
165 99:50 MRL Confirm N2O coupling is connected properly 1
166 99:20 MRL HOLD HOLD 1
167 99:20 EGSE/MRL Verify Bottle Temperatures @ OxT1, OxT2, HPT2 1 00:10
168 99:20 EGSE/MRL Verify Water Temperatures @ Ox@T1, OxWT2, HPWT2 1 00:10
169 99:20 MCC CONTINUE AFTER HOLD
170 99:20 MRL BEGIN SEQUENCE: Arming Rocket Part 1 Arming Rocket Pt.1 1
171 99:20 MRL Confirm working Personel is grounded 1 01:00
172 99:20 MRL Confirm all spring retracted hatches are moving freely 1
173 98:50 MRL Turn on GoPro Camera at end of Launch Rail 1 00:20
174 99:20 MRL Connect Ignition Umbilical 1 00:30
175 98:30 MRL Insert all EPS Bridges 1 03:00
227 67:40 EGSE Zero OxTank Mass 3
228 67:40 MCC Write down Time 3
229 67:40 EGSE Open OxV1 3 04:00
230 63:40 OBDH Open & Close RDV STEPWISE until N2O bottle empty or 25kg OxTankMass, keep temperatures RDVT and RDVET above 10C and Check delta ROxTPT and OxInPT1 3 30:00:00 30:00
231 33:40 EGSE Verify Bottle Temperatures @ OxT1, OxT2, HPT2 1 00:10
232 33:40 EGSE Verify Water Temperatures @ Ox@T1, OxWT2, HPWT2 1 00:10
233 33:40 EGSE Close OxV1 3 00:10
254 8:15 OPS Align MRL to Launch Trajectory 3
255 8:15 MCC Turn audio volume down 3
256 8:15 MCC Turn off Confirm delay 3
8:15 MCC Confirm MRL adjustment with OPS 3
257 8:15 ALL Talk through Launch Sequence 3
258 8:15 AVC MCC Start Video Recording in Block House Confirm MRL adjustment with OPS 3
259 8:15 AVC Start Video recording in Block House 3
260 8:15 MCC CONTINUE AFTER HOLD
261 8:15 MCC BEGIN Switching to Internal Power Sequence Switch to Internal Power 3
262 8:15 EGSE Switch to internal Power 3 00:20
302 0:00 OBDH T+310: Verify Main Chute Deployed and RDV Open (Main) 4
303 0:00 OBDH T+600: Verify (Landed) 4
304 0:00 MCC BEGIN SEQUENCE: PASSIVATION (PHASE YELLOW) (Write down Time) Passivation 2
305 68:40 MCC Announce BEGIN of Radio Silence 3
306 0:00 MCC Turn audio volume up 2
307 0:00 TMTC Check ROxTPT & RHPPT 1 Bar, if more: Open & Close STEPWISE RDV 2
308 0:00 MRL Go to Testrig, Close N2O Bottle 1 & N2O Bottle 2 then RETURN to Block House 2